![]() ![]() Inspection and test plan must be submitted ahead of time for SAPMT, SAPID and TECNICAS RHEUNIDAS.ħ.1. All installed Electrical and instrumentation conduit shall be inspected for elevation and routine as per approved IFC drawings.Ħ.5. All electrical and instrumentation materials for below grade conduit duct bank installation shall be inspected as per approved documents.Ħ.4. The detailed inspection stages and methods shall be as per the approved inspection and test plan.Ħ.3. The quality control program shall be as per (SAES) Saudi Aramco Engineering Standards.Ħ.2. Check adequacy and availability of all tools and equipment for erection and installation activities, before commencement of erection activityĦ.1. Restrict personnel / equipment entering the work areaĥ.7. Place barricade and warning sign boards in applicable locations. Conduit field offset or bend will be done as per approved field method.ĥ.6. Conduct job safety talk before starting the work.ĥ.5. All personnel involved in the activities shall wear complete personal protective equipment (PPE) in accordance with safe work requirements.ĥ.4. Ensure all applicable work permit is approved related to underground conduit duct bank installation.ĥ.3. Ensure that the JSA job safety analysis is approved prior to start the activity work related to duct bank.ĥ.2. SAES-P-100 Basic Power System Design Criteriaĥ.1. SAPOD : SAUDI ARAMCO POWER OPERATION DISTRIBUTION SAPID : SAUDI ARAMCO PROJECT INSPECTION DIVISION GAC E&I QC inspector ensure that the construction method of procedures is adhered to the ARAMCO standard with reference to approved project specifications. The scope covers the step to be followed for the installation of below grade concrete encased conduit duct bank installation for electrical, instrumentation and telecom works intended for permanent installation in the plant. The purpose of this QCP is to ensure that all works regarding below ground concrete encased conduit duct bank installation for instrumentation, electrical and telecom works and their fittings shall be done in accordance with the ARAMCO standards and all other applicable international codes and standards. Drilling Excel calculation tool that can be downloaded and edited. Drilling Excel Sheets Now you can download for free a spreadsheet of formulas & calculations for drilling operations that will be useful for rig workers.Those calculation tools cover key calculations that Engineers have to do all… ![]() Excel calculation tool that can be downloaded and edited.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |